ORANGE

We are at ORANGE according to the NZ COVID-19 Protection Framework.  Protect yourself and our community by getting boosted, wearing a mask when out and about and reducing contact with others. Hospital visitors don’t need a Vaccine Pass, but must wear a surgical/medical paper mask. Fabric face coverings are no longer acceptable.  See our COVID-19 page for general COVID-19 advice, detailed hospital visiting guidelines and COVID-19 tests.

See www.vaccinatecanterburywestcoast.nz for info on vaccinations.

Redevelopment

24 documents.

Buller Health Services are on the Move – Flyer

In preparation for the demolition needed to make way for construction of the new Buller Health facility, we are relocating a number of services to other areas of the
facility over the weekend starting Friday 22 November 2019.
From Monday 25 November, our Cobden Street entrance will become the single point of entry for the majority of our services, including Buller Medical Centre.

This flyer contains information that you need to know if you’re planning to visit the facility.

Tags

More informationDownload pdf (505 KB)

Buller Integrated Health Floor Plan – Revision F

Buller Integrated Health Floor Plan, Revision F.  (Revised: 9 February 2018)

Concept Design. 

Tags

More informationDownload pdf (193KB)

WCH Facilities Newsletter – January 2018

West Coast Health Facilities Redevelopment Update

Tags

More informationDownload pdf (2MB)

West Coast Health Facilities Redevelopment Update – November 2017

Topics in this issue: Grey facilities: Where we’re at!; What to expect in the new Grey health facilities, and more.

Tags

More informationDownload pdf (2 MB)

WCH Facilities Newsletter – August 2017

West Coast Health Facilities Redevelopment Update

Tags

More informationDownload pdf (1MB)

WCH Facilities Newsletter – April 2017

West Coast Health Facilities Redevelopment Update

Tags

More informationDownload pdf (1MB)

Minister’s announcement – Extra $9.7m for West Coast redevelopment

Health Minister Jonathan Coleman says the Government has approved an extra $9.7 million in funding to ensure the new Grey Base Hospital is a high quality facility with construction starting next week.

Tags

More informationDownload pdf (46KB)

Showing 1-24 of 24 results, page 1 of 1.

Page last updated: 23 November 2021

Is this page useful?