1. How much has been spent to date on the new Buller Health Centre project, itemised please (ie pre-planning, consultancy fees, design, tendering, construction). 2. What is the current budget for the new health centre? 3. If the current budget differs from the original budget of $20m, what is the reason for the differences? 4. If the project is running over budget, where are savings being made, how, and how much is expected to be saved? 5. What is the latest expected completion date? It was originally March 2023 and more recently has been cited as the second quarter of 2023? Does this mean April, May or June 2023 – or possibly later? 6. Does the West Coast District Health Board have a budget and a timeframe for demolishing the existing buildings on the Buller Health site – if so, how much is the budget and what is the timeframe? 7. If there is no budget or timeframe for demolition, why not? 8. What will happen to the existing buildings if they are not demolished (ie could they be sold, leased etc)?
Showing 1-1 of 1 results, page 1 of 1.
Page last updated: 21 December 2021
Is this page useful?