COVID-19 (Coronavirus)

Information about changes at West Coast DHB Grey Base Hospital and health centres can be found on our dedicated COVID-19 Information page

Document Library

Our latest key plans and reports are listed at the top of this page, other recent documents are listed by date under these documents. 

Use the search menu (left) to apply a filter to list other documents published by the West Coast DHB, including our annual reports, annual plans and strategic plans. Each document has a document type, a summary, and topics and tags associated with it.

You can apply the search menu filters including date range, document types and topics, and also use the links on document pages to find groups of related documents.

51 documents in "Facilities".

Level of insulation at Reefton Integrated Health Centre / Ziman House.

Official Information Request WCDHB 9401

I refer to your email dated 27 February 2020 requesting the following information under the Official Information Act from West Coast DHB.

1. I wanted to enquire into the level of insulation at the Reefton Integrated Health Centre/ Ziman House.
a. Is there underfloor insulation, double glazed windows and when the last time the ceiling was pink batted.
b. Also if there were any plans to insulate the building in the future?

Tags

More informationDownload pdf (231 KB)

Buller Health Services are on the Move – Flyer

In preparation for the demolition needed to make way for construction of the new Buller Health facility, we are relocating a number of services to other areas of the
facility over the weekend starting Friday 22 November 2019.
From Monday 25 November, our Cobden Street entrance will become the single point of entry for the majority of our services, including Buller Medical Centre.

This flyer contains information that you need to know if you’re planning to visit the facility.

Tags

More informationDownload pdf (505 KB)

Summary of Feedback on the Proposed Health Facility for Westport

A summary of community feedback on the draft concept plans and site as at 20 April 2018

More informationDownload pdf (954KB)

Buller Integrated Health Floor Plan – Revision F

Buller Integrated Health Floor Plan, Revision F.  (Revised: 9 February 2018)

Concept Design. 

Tags

More informationDownload pdf (193KB)

Buller Public Meeting

Proposed Health Facility for Westport

More informationDownload pdf (2MB)

Buller Public Meeting – April 2018

Proposed Health Facility for Westport

More informationDownload pdf (2MB)

WCH Facilities Newsletter – January 2018

West Coast Health Facilities Redevelopment Update

Tags

More informationDownload pdf (2MB)

West Coast Health Facilities Redevelopment Update – November 2017

Topics in this issue: Grey facilities: Where we’re at!; What to expect in the new Grey health facilities, and more.

Tags

More informationDownload pdf (2 MB)

WCH Facilities Newsletter – August 2017

West Coast Health Facilities Redevelopment Update

Tags

More informationDownload pdf (1MB)

West Coast Health Facilities Redevelopment Update – April 2017

Topics in this issue: Parking; Noise; Steel; Milestones; Tell us about; Keep track, and more.

Tags

More informationDownload pdf (1 MB)

WCH Facilities Newsletter – April 2017

West Coast Health Facilities Redevelopment Update

Tags

More informationDownload pdf (1MB)

Minister’s announcement – Extra $9.7m for West Coast redevelopment

Health Minister Jonathan Coleman says the Government has approved an extra $9.7 million in funding to ensure the new Grey Base Hospital is a high quality facility with construction starting next week.

More informationDownload pdf (46KB)

Showing 1-40 of 51 results, page 1 of 2.

Page last updated: 14 March 2019

Is this page useful?